With advanced equipment and professional teams, our company provides customers with MPD proposal services, MPD consulting services, managed pressure drilling and managed pressure cementing technical services
Technical Services
Technical Services
With advanced equipment and professional teams, our company provides customers with MPD proposal services, MPD consulting services, managed pressure drilling and managed pressure cementing technical services
Features of Heminzenith's MPD Technical Services
01
Heminzenith has been providing MPD technical services for many years and has developed a series of localized solutions based on industry-leading technology (equipment) which can offer targeted service tailored to our clients’ technical challenges.
02
The core equipment is independently developed by Heminzenith, ensuring high control precision, and stable and reliable performance.
03
We possess the Managed Pressure Cementing technical competence, effectively addressing the limitations of this technique in field applications.
04
Equipped with a large-diameter rotating control head, which can meet the requirements for passing large-size drilling tools.
05
Large displacement back pressure compensation pump establishes the fundamental conditions for providing high wellhead pressure during ultra-deep drilling operations.
Photos of On-Site Technical Services
Achievements
Between 2019 and 2026, the company completed over 40 well operations of precision managed pressure drilling services in PetroChina Southwest Oil & Gas Field Company and CNOOC regions. These operations achieved a maximum well depth of 8,200 meters with H2S concentrations reaching 100ppm. The technology effectively resolved complex downhole challenges in high-sulfur deep and ultra-deep wells—including lost circulation, simultaneous lost circulation and blowout caused by narrow density windows—providing robust technical support for sulfur-bearing reservoir development in the Sichuan-Chongqing region. Key benefits included enhanced drilling efficiency, reduced operational risks, and improved safety in hydrogen sulfide environments.
The company's advanced equipment and highly skilled operational teams received unanimous praise from clients (Party A) for their reliability and performance in critical drilling scenarios.
Performance Certificate for Automatic Choke and Pressure Control System
Drilling & Production Engineering Technology Research Institute,
CNPC Chuanqing Drilling Engineering Company Limited
Underbalanced Drilling Technical Service Company
June 30, 2022
The automatic choke and pressure control system provided by Heminzenith Oil&Gas Engineering (China) Co., Ltd. was deployed for precise managed pressure drilling operations in MX 019-H2 Well (containing hydrogen sulfide) of Petro China Southwest Oil & Gasfield Company, from October 22, 2021 to May 7, 2022, and the task was safely and smoothly completed. The designed depth of this well is 23877.95 feet, and the drilling operations were executed by CNPC Chuanqing Drilling Engineering Company Limited Chuandong Drilling Company, Drilling Team 70596.
Performance Certificate for Wellhead Pressure Control Technical Services
Drilling & Production Engineering Technology Research Institute,
CNPC Chuanqing Drilling Engineering Company Limited
Underbalanced Drilling Technical Service Company
July 28, 2024
The precise MPD operation team and automatic choke and pressure control system equipment from Heminzenith Oil&Gas Engineering (China) Co., Ltd. arrived at the PS-20 Well on February 14, 2024, to provide wellhead pressure control technical services. From February 14, 2024 to July 21, 2024, the team successfully drilled from a depth of 7811.6798 ft to a total depth of 20711.9423 ft (with hydrogen sulfide present) using MPD technology. The drilling operations were executed by CNPC Chuanqing Drilling Engineering Company Limited Chuandong Drilling Company, Drilling Team 80019.
Performance Certificate for Wellhead Pressure Control Technical Services
Drilling & Production Engineering Technology Research Institute,
CNPC Chuanqing Drilling Engineering Company Limited
Underbalanced Drilling Technical Service Company
February 23, 2024
The automatic choke and pressure control system provided by Heminzenith Oil&Gas Engineering (China) Co., Ltd. was deployed for precise managed pressure drilling operations in HT 1 Well from December 14, 2023 to January 29, 2024. The equipment operated continuously for 45 days in this single well, achieving a total depth of 18562.99 feet (in a hydrogen sulfide-containing environment). The drilling operations were executed by CNPC Chuanqing Drilling Engineering Company Limited Chuanxi Drilling Company, Drilling Team 50728.
Performance Table
| Time | Services | Well Number | Well Depth (m) | Client |
|---|---|---|---|---|
| 2019 | managed pressure drilling | MX022-H20 | 6,000 - 7,000 | CNPC |
| managed pressure drilling, managed pressure cementing | MX022-H32, GS122, MX022-H32 | 6,500 - 7,000 | CNPC | |
| managed pressure drilling, managed pressure cementing | ST6 | 8,200 | CNPC | |
| 2020 | drilling, managed pressure cementing | GS131X, GS133, GS127, SY001-X8, SY001-X9 | 5,900 - 7,600 | CNPC |
| 2021 | drilling tool services, managed pressure drilling | SY001-X9, MX019-H2 | 5,200 - 7,600 | CNPC |
| 2022 | managed pressure drilling & drilling tool services, managed pressure cementing | MX019-H2, MX019-H14, GS009-H4, GS045-H1 | 5,200 - 6,800 | CNPC |
| managed pressure drilling | QHD26-1-1D | 3,498 - 4,069 | CNOOC | |
| 2023 | managed pressure drilling & drilling tool services | PS21, PY6, XX1 | 4,700 - 6,800 | CNPC |
| 2024 | managed pressure drilling technical services, equipment services | HT1, PX1, PS20 | 4,300-6,500 | CNPC |
| 2025 | Managed pressure drilling, overflow early warning & well control safety assurance, fully automated managed pressure cementing | LT1, PY113, PS309 | 4,500-6,200 | CNPC |